DAQ Teleconference Nov 12, 2003, 3PM Central
| Call in (734)414-0267 |
| Part. Code: 339397 |
| Host Code: 129939 |
Minutes
RMH update
- Bad hardware : two crate controllers and one cable
- Readout of 3-crates now working under test routines
- Bad modules to be repaired (we hope) in Italy
- Will also check with SELEX people for supply
- Integratin with DAQ to be completed next week when Andre returns to FNAL
XML2DB
- See David's Posting
- Use XML2DB routines to store Detector configuration files
- Write run configuration xml output the same way
- At end of run, make second entry that fills in end of run statistics, such as number of events
- Absence of second entry with run statistics indicates run control crash
Other
- Sharon has started a prelim. Run Control Statistics page, served by e907mon
- With RMH rading out, BCKV and E/HCAL are the only detectors that still lacking DAQ modules - to be remedied soon