DAQ Teleconference Oct 22, 2003, 3PM Central
| Call in (734)414-0267 |
| Part. Code: 339397 |
| Host Code: 129939 |
Minutes
DAQ status
- Ckov - adc module readout via mdd/sevb using xml config for branch, crate and slot info
- TPC - 3 quad readout via mdd/sevb
- Simultaneous tests achieved for single pulser trigger
DAQ todo
- Flesh out generic CamacReat.cc
- Write ECAL module Camac class (Durga)
- Test RMH (Nick/Andre)
- Fix TPC receiver on/off switching
- integrate RC with r2dm and mdd
- Full scale cosmic readout by Nov 7'th
Trigger - Outline and Tasks
I.Physics Goals (Ron)
A.Beam Tagging
B.Interactions
II.Beam Characteristics (Holger)
A.Structure
1.Spill
2.Sub-spill
B.Composition
III.Trigger Hardware
A.Detector Inputs
1.TOF T0/T01, Veto (Carl)
3.BCKV (Win)
5.DC1/4 (Pierrick/Holger)
B.Trigger inputs and gates
1.CES8210 (Andre)
2.TPC clock module (Mike)
3.BCKV (Win)
4.DC (Pierrick/David M.)
5.CKOV (David L.)
6.TOF (Carl/Tim)
7.DC5/6 (Nick)
7.RICH (Andre)
8.ECAL (Durga)
9.HCAL (LanChun)
IV.Trigger Design (Ron)
A.Logic
1.Beam & Pre-trigger
a)Beam on target
b)ID tagging
c)Pile-up rejection
2.Interaction
a)Bulls-eye
b)Multiplicity
3.LVL2 & Fast Clears
B.Timing
1.Detector Latencies
2.Logic Delays
3.Input Fan-outs
V.Initial Setup
A.Trigger Commissioning
B.Run-time adjustments