DAQ Teleconference Sep 18, 2003, 3PM Central
| Call in (734)414-0267 |
| Part. Code: 339397 |
| Host Code: 129939 |
Minutes
Trigger interrupts
- Now coded with semaphores
- Testing shows significant speed improvement, 12usec latch reset down from 40
- Also, plan to disable INT 4 on CES8210 and send ACK2 input into INT4 to latch ACK4 as a hardware busy, to be reset in software
RMH
- 2-modules were missing, a controller and a back-plane transition module. These have been supplied
- Nick has code (rmh.c and includes) from Italian group
- Has begun converting to C++ class structure for use in MIPP DAQ
- Italian group in town to help until the Sep 25
Camac
- LRS2249.cxx ADC module still needs testing
- Perrick working on hardware map for Drift Chambers
TPC
- Able to talk to sticks over bitbus
- Presently de-coding stick data formats (in dsp)
- Interrupt module at LLNL has not lines on VME interrupt
- Perhaps different flavors of these LBL modules existed --- Peter to check modules on the floor
Enstore
- We can write files to enstore
- David to integrate some file transfer/checking perl scripts with enstore to be used in MIPP
DAQ-FEST
- Plan to test all detectors with TPC at FNAL during week of Nov 3'rd.