28 November 2001 Contents
- Rosie
- Discussion
- Next Meeting
Leon Beverly, 12-4-01
Minutes of E907 meeting on Wednesday November 28, 2001
1. Rosie
Water flow on the damaged coil is ok. An epoxy patch has been put
over the area of bare copper. The coil will be moved back to ME7 to
await installation in MC7.
- Damaged coil belonging to Rosie has been tested at MAB with
results listed below.
- Water flow test for both inner and outer coils are both very
close at 1.3 GPM with input pressure at 110 PSI.
- PSID test (differential PSI gauge) showed very similar
results. Input PSI of 110 PSI with a differential gauge reading of
93 PSI. This was typical of both inner and outer coils.
- Coil assembly was hydrostatically tested at 500 PSI for 3
hours with no pressure drop.
- Damaged area of coil was repaired with epoxy patch.
- Coil assembly is ready for Mike Mascione to return back to ME7
with it's companions.
Thanks, Dave
2. General Discussion
General discussion on TPC support stand for moving TPC in and out
of JGG, targets, CKOV and ECAL locations.
3. Next Meeting
The next meeting will be Wednesday, December 5, Theory Room, WH3NE
at 10:30AM.
[Meeting December 5 cancelled; next meeting January 2, 2002. -
PDB]
PDB, 1/8/02