E907 Installation Meeting Minutes

2 January 2002 Contents

  1. MOU and SOW
  2. Component Locations
  3. Contacts
  4. TPC
  5. Counting House
  6. Next Meeting


Leon Beverly, 1-7-02

Minutes of E907 meeting on Wednesday January 2, 2002

1. MOU and SOW

The Statement of Work (SOW) and Memorandum of Understanding agreements between Fermilab and Livermore are nearing completion. An important point is that Fermilab will pick up the cost of Engineers (includes Designers) on the project. Therefore, Engineering and drawing work can resume. Regarding Fermilab effort reports, please record E907/the apparatus requiring your effort.

2. Component Locations

With the exception of the ToF, Raja has produced a document that has the location of equipment that will go in MC7.

Gary Smith (other than Peter phoning in, Gary was my lone meeting attendee) will, using Raja spreadsheet, locate apparatus on a drawing which will lead to answering two (but will probably lead to more) burning questions: will the Detector components fit; can all chambers be wheeled in/out of their locations with all other components in place? Additionally, chamber to be used need to have their number assigned as to which will be #1, #2, etc.

3. Component Contacts

Additionally, following is a list of the E907 Contact People:

System

Contact

Beam Cerenkovs

Mike Heffner

Target Wheel

Jerry Peterson

TPC

Peter Barnes and Ron Soltz

Cerenkov

Doug Wright

Chambers

Ed Hartouni

TOF

Sanjib Mishra

RICH

Earl Swallow

Calorimeter

Mike Longo

DAQ

Ron Soltz

Monte Carlo

Rajendran Raja

Installation

Leon Beverly

4. TPC

A clean room will be needed US of the JGG. Can the room be designed to meet the specs of both a clean room and Hydrogen target house?

5. Counting House (MC8 porta-kamps)

Clean up will begin. The north PK needs new carpet installed before people move in.

6. Next Meeting

The next meeting will be Wednesday, January 9, Theory Room, WH3NE at 10:30AM.


PDB, 1/8/02