E907 Installation Conference Call Minutes

16 May 2002

Location

Phone Number

Access Code

WH-11SW

775-785-1944

536495

Contents

Agenda

Progress Updates and Issues

  1. Upstream Beamline
    1. BEAM - Beamline
    2. UBL - Upstream Beamline Detectors
  2. Targets
    1. TGTW - Target Wheel
    2. CTGT - Cryo Targets
    3. NTGT - NuMI (MINOS) Target
  3. TPC - Time Projection Chamber
  4. Magnets
    1. JGG - Jolly Green Giant
    2. Rosy
  5. CKOV - Cerenkov
  6. DC - Chambers
  7. TOF - Time of Flight
  8. RICH - Ring Imaging Cerenkov
  9. NCAL - Calorimeter
  10. DAQ - Data Acquisition
  11. MC - Monte Carlo
  12. Installation
    1. Alignment
  13. MC7 - Enclosure and Counting House
  14. Meetings
  15. Project Management

Next Call


Agenda

Time (CST)

Dur (min)

Lead

Topic

3:00

5'

call setup

Chuck Brown

BEAMS

Mike Heffner

Beam CKOV

Ron Soltz
Ingrid Fang

TPC
Stand

Leon Beverly

Magnets Install Schedule

Ingrid Fang
Gary Johnson

CKOV Stand design and drawing status

Leon Beverly
Mark Messier

RICH rail installation schedule
RICH electronics

Leon Beverly

Chamber brackets, adapter cards.

Tim Bergfeld

TOF

Virgil Bocean

Alignment

AOB


Progress Updates and Issues

Leon Beverly's meeting summaries in italics.

Upstream Beamline

BEAM - Beamline

Chuck Brown:

Minimum progress on pile opening, riggers moved to a higher priority job.

UBL - Upstream Beamline Detectors

Beam CKOV:

Jim will use beam pipe recently removed from MW6 for beam pipe in MC7. The pipe is slightly radioactive, low class 1 - 0.1mr/hr

Targets

TGTW - Target Wheel

CTGT - Cryogenic Targets

NTGT - NuMI (MINOS) Target

TPC - Time Projection Chamber

Ingrid is gathering design parameter on the support cart.

Magnets

John [Cooper] has reviewed the installation procedure. I expect to have all signatures on Monday. So steel setting will commence on Tuesday, the 21st.

JGG - Jolly Green Giant

Rosy

CKOV - Cerenkov

Drawings for the inner & outer stands are complete, beginning the drawing for support stand, then need an assembly drawing.

DC - Drift Chambers

Awaiting discriminator adapter boards so an entire chamber can be readout at once.

Ed LaVallie is commencing design on support stands for the Iowa chambers, chambers #5 & #6

TOF - Time of Flight

RICH - Ring Imaging Cerenkov

Anticipating deliver of rails and stand in June.

NCAL - Calorimeter

DAQ - Data Acquisition

MC - Monte Carlo

Installation

Alignment

MC7 Enclosure and Counting House

Meetings

Project Management

Next Systems Call

The next call will be Thursday, May 23, 2002, at 3:00 CDT in WH-11SW.


PDB, 5/28/02