E907 Installation Conference Call Minutes
|
5 September 2002 |
Location |
Phone Number |
Access Code |
|
WH-11SW |
805-240-9463 |
536495 |
Agenda
|
Time (CST) |
Dur (min) |
Lead |
Topic |
|---|---|---|---|
|
3:00 |
5' |
call setup |
|
|
Chuck Brown |
BEAMS |
||
|
Mike Heffner |
Beam CKOV |
||
|
Ron Soltz |
TPC |
||
|
Leon Beverly |
Magnets |
||
|
Leon Beverly |
CKOV stand |
||
|
Mark Messier |
RICH |
||
|
Adam Bujak |
Chamber testing |
||
|
Ed LaVallie |
Iowa chamber stands |
||
|
Tim Bergfeld |
TOF |
||
|
Virgil Bocean |
Alignment |
||
|
AOB |
Leon Beverly's meeting summaries in italics.
BEAM - Beamline
UBL - Upstream Beamline Detectors
BCKOV
TGTW - Target Wheel
CTGT - Cryogenic Targets
NTGT - NuMI (MINOS) Target
Stationary stand & movable stand drawings are checked; Ingrid will have Chuck G. to get cost estimates for fabricating stands; assembly drawing will be done next.
Painting in progress; spaces between coils on the US & DS ends of Rosie need to be shimmed &endash; Jim EllermeierZiptrack &endash; Jim K. to seek cost estimates for machining parts for cart, Leon &endash; ship assembly pieces to lab 8 where they will be assembled; software - crashed hard disc recovered by CA company, plan to move to LabView.
JGG - Jolly Green Giant
Rosie
Cart & DC#2 inner/outer frame have been assembled & installed, need to develop plan for installing the CKOV into cart.
E690 Chambers
Cable-way brackets/housing design complete, parts on order; also discussion about using Virginia chambers in primary beamline, no decision.
Iowa Chambers
Support stand drawing will not be done until after TPC drawings are complete.
V-groove casters bind on rail when the RICH is moved, Jim &endash; need swivel casters?
Alignment
Survey of JGG needs to develop an axis line that is parallel to the pole tips and in the center of the aperature, which defines beam height.
The next call will be Thursday, 12 September 2002, at 3:00 CDT in WH-11SW.