E907 Installation Conference Call Minutes

5 September 2002

Location

Phone Number

Access Code

WH-11SW

805-240-9463

536495

Contents

Agenda

Progress Updates and Issues

  1. Upstream Beamline
    1. BEAM - Beamline
    2. UBL - Upstream Beamline Detectors
  2. Targets
    1. TGTW - Target Wheel
    2. CTGT - Cryo Targets
    3. NTGT - NuMI (MINOS) Target
  3. TPC - Time Projection Chamber
  4. Magnets
    1. JGG - Jolly Green Giant
    2. Rosy
  5. CKOV - Cerenkov
  6. DC - Chambers
  7. TOF - Time of Flight
  8. RICH - Ring Imaging Cerenkov
  9. NCAL - Calorimeter
  10. DAQ - Data Acquisition
  11. MC - Monte Carlo
  12. Installation
    1. Alignment
  13. MC7 - Enclosure and Counting House
  14. Meetings
  15. Project Management

Next Call


Agenda

Time (CST)

Dur (min)

Lead

Topic

3:00

5'

call setup

Chuck Brown

BEAMS

Mike Heffner

Beam CKOV

Ron Soltz

TPC

Leon Beverly

Magnets

Leon Beverly

CKOV stand

Mark Messier

RICH

Adam Bujak

Chamber testing

Ed LaVallie
Ingrid Fang

Iowa chamber stands
DC 3 & 4 stands

Tim Bergfeld

TOF

Virgil Bocean

Alignment

AOB


Progress Updates and Issues

Leon Beverly's meeting summaries in italics.

Upstream Beamline

BEAM - Beamline

UBL - Upstream Beamline Detectors

BCKOV

Targets

TGTW - Target Wheel

CTGT - Cryogenic Targets

NTGT - NuMI (MINOS) Target

TPC - Time Projection Chamber

Stationary stand & movable stand drawings are checked; Ingrid will have Chuck G. to get cost estimates for fabricating stands; assembly drawing will be done next.

Magnets

Painting in progress; spaces between coils on the US & DS ends of Rosie need to be shimmed &endash; Jim Ellermeier

Ziptrack &endash; Jim K. to seek cost estimates for machining parts for cart, Leon &endash; ship assembly pieces to lab 8 where they will be assembled; software - crashed hard disc recovered by CA company, plan to move to LabView.

JGG - Jolly Green Giant

Rosie

CKOV - Cerenkov

Cart & DC#2 inner/outer frame have been assembled & installed, need to develop plan for installing the CKOV into cart.

DC - Drift Chambers

E690 Chambers

Cable-way brackets/housing design complete, parts on order; also discussion about using Virginia chambers in primary beamline, no decision.

Iowa Chambers

Support stand drawing will not be done until after TPC drawings are complete.

TOF - Time of Flight

RICH - Ring Imaging Cerenkov

V-groove casters bind on rail when the RICH is moved, Jim &endash; need swivel casters?

NCAL - Calorimeter

DAQ - Data Acquisition

MC - Monte Carlo

Installation

Alignment

Survey of JGG needs to develop an axis line that is parallel to the pole tips and in the center of the aperature, which defines beam height.

MC7 Enclosure and Counting House

Meetings

Project Management

Next Systems Call

The next call will be Thursday, 12 September 2002, at 3:00 CDT in WH-11SW.


PDB, 9/12/02