E907 Installation Conference Call Minutes

24 October 2002

Location

Phone Number

Access Code

WH-3NE

805-240-9463

536495

Contents

Agenda

Progress Updates and Issues

  1. Upstream Beamline
    1. BEAM - Beamline
    2. UBL - Upstream Beamline Detectors
  2. Targets
    1. TGTW - Target Wheel
    2. CTGT - Cryo Targets
    3. NTGT - NuMI (MINOS) Target
  3. TPC - Time Projection Chamber
  4. Magnets
    1. ZipTrack
    2. JGG - Jolly Green Giant
    3. Rosy
  5. CKOV - Cerenkov
  6. DC - Chambers
    1. DC1-4 (E690 Chambers)
    2. DC5 & DC6 (Iowa Chambers)
  7. TOF - Time of Flight
  8. RICH - Ring Imaging Cerenkov
  9. ECAL - EM Calorimeter
  10. NCAL - Hadron Calorimeter
  11. Gas Systems
  12. DAQ - Data Acquisition
  13. MC - Monte Carlo
  14. Installation
    1. Alignment
  15. MC7 - Enclosure and Counting House
  16. Meetings
  17. Project Management

Next Call


Agenda

Time (CST)

Dur (min)

Lead

Topic

3:00

5'

call setup

Chuck Brown

BEAMS

Mike Heffner

Beam CKOV

Ron Soltz

TPC

Leon Beverly

Magnets

Leon Beverly

CKOV stand

Mark Messier

RICH

Adam Bujak

Chamber testing

Ed LaVallie
Ingrid Fang

Iowa chamber stands
DC 3 & 4 stands

Tim Bergfeld

TOF

Virgil Bocean

Alignment

AOB


Collaboration Meeting Dates

Raja:

The next collaboration meeting is on November 9th, with Friday November 8th devoted to systems specific meetings.

The meeting after this was initially announced for Feb 14, 2003. Unfortunately, as several people have pointed out, this happens to be St. Valentine's day. So we are moving this meeting to Feb 8th 2003 with Feb 7th being devoted to systems meetings. Please mark your calendar.

Progress Updates and Issues

Leon Beverly's meeting summaries in italics.

Upstream Beamline

BEAM - Beamline

UBL - Upstream Beamline Detectors

BCKOV

Win Baker:

Below is what I sent Raja regarding my efforts to resurrect the counters used in E104. The E706 counter was those two counters joined to form one with a different focal length mirror. The two original mirrors are nowhere to be found.

Carol Johnstone is pondering the E706 counter, which she upgraded to count several particles simultaneously, to see if any tricks can be done to make it useable.

I have searched Lab 6, talked with Karen Kephart, searched the warehouse (#2) and talked to the people there. No sign of the other mirrors. Karen said she would contact Bud Koecher to see if he remembers anything about them.

A more careful check of your curves says they are just right. The separation of the Cerenkov angles of two given particles varies inversely as the square of the momentum. There's nothing we can do about that. Carol's optics for simultaneous tagging of three particles works at a specific (high) momentum but not for the range of E907. The tragedy is that the original two counter configuration was designed for momenta up to 200 GeV, which would be perfect for us. The lab in its mania to junk stuff has thrown out the baby with the bathwater.

Targets

TGTW - Target Wheel

CTGT - Cryogenic Targets

NTGT - NuMI (MINOS) Target

TPC - Time Projection Chamber

Ron Soltz:

Clock circuits - Bob Jones should have started work this week (clocks and stick testing).

Support stand, cart/rails &endash; requisition faxed to LLNL 10/17.

Magnets

ZipTrack

Holger Meyer:

Calibration of Hall Probes for JGG and Rosie: Setup in IB1 is complete. Calibrations will start this morning. Expect to have four probes calibrated by tonight.

Ready to move from Lab 8.

LCW

10/25/02

JGG connect coil hoses

10/28/02

Rosie connect coil hoses

~11/4/02

MC7 Main Headers install pipes (T&M requisition in system)
leave with bus capped and hose jumper connected

~10/30/02

DC Power ready to operate

Currently 2 x 500 kW supplies being prepared, need to connect hoses

Need pORC to operate

JGG - Jolly Green Giant

Rosie

Shim Rosie coils at end saddle.

CKOV - Cerenkov

Move from PC4 to MC7 late November.

DC - Drift Chambers

DC1-4 (E690 Chambers)

Ingrid Fang:

Chamber 3 support: The drawings are in progress under my supervision.

Chamber 4 support: 90% complete and still have a few details to finish.

DC5 & DC6 (Iowa Chambers)

Support stand drawings are in first revision between Gary and Ed.

TOF - Time of Flight

RICH - Ring Imaging Cerenkov

ECAL - EM Calorimeter

HyangKyu Park:

To: "Jose Delao" <delao@fnal.gov>
Thanks very much for showing all lead. Discussing with my boss, we think we can use those thin sheets (~20 sheets), about 30" by 60" of size. Would you keep them a safe area ?

From: "Jose Delao" <delao@fnal.gov>
Considered it done. I will have them ready for you. Keep in mind- that you need to have all the proper training. That is whoever you're going to have handle the lead. Get it done now, so you don't have to wait till the last minute.

Sketches shown at this meeting:

Lead Plate Supports - Front View

Side View

Front View with Chambers

(.pdf, .gif)

(.pdf, .gif)

(.pdf, .0gif)

NCAL - Calorimeter

Gas Systems

Terry Tope:

It appears that the lab does not want to allow the release of even the small amount of Freon 13B1 that chambers 5-6 would use. If these chambers use Argon (Boiling Point -186C), Isobutane (BP -12 C), Freon 13B1 (BP -58C), and Isopropanol (BP 82C) separating out the Freon would be tricky based on the boiling points and liquefication. Let me know if you feel the Freon is vital and we should pursue this further with the lab or from a technical standpoint.

DAQ - Data Acquisition

Ron Soltz:

prelim daq C++ daq class layout nearly complete; DAQ meeting for next Wed.

MC - Monte Carlo

Installation

Alignment

Request in for laser tracker to support ziptrack & install a control network next week in MC7.

MC7 Enclosure and Counting House

Meetings

Project Management

Next Systems Call

The next call will be Thursday, 31 October 2002, at 3:00 CDT in WH-3NE, Theory Room.


PDB, 10/21/02