20 May 2003 |
Location |
Phone Number |
Access Code |
|
WH-2 NE |
865-673-6703 |
334823 |
Progress Updates and Issues
- Upstream Beamline
- Targets
- TPC - Time Projection Chamber
- Magnets
- CKOV - Cerenkov
- DC - Chambers
- TOF - Time of Flight
- RICH - Ring Imaging Cerenkov
- ECAL - EM Calorimeter
- NCAL - Hadron Calorimeter
- Gas Systems
- DAQ - Data Acquisition
- MC - Monte Carlo
- Installation
- MC7 - Enclosure and Counting House
- Meetings
- Project Management
Leon Beverly's meeting summaries in italics.
BEAM - Beamline
UBL - Upstream Beamline Detectors
BCKOV
TGTW - Target Wheel
CTGT - Cryogenic Targets
NTGT - NuMI (MINOS) Target
David Miller:
Holger and I will measure the TPC's O-ring diameter this afternoon and measure the total length needed to re-gasket. We can then order the o-ring cord stock from McMaster-Carr.
ZipTrack
JGG - Jolly Green Giant
Rosie
Doug Wright:
I finally connected with Terry Tope. We went over my calculations and desired features for the ckov gas system. He is reviewing the info that I put on our web page and will come up with a concrete design (he is familiar with the low-pressure hardware that we need).
DC1-4 (E690 Chambers)
David Miller:
Here is a one-sided account of the chamber status. Pierrick will fill you in on the electronics side.
Chamber #4:
DC4 was moved to MC7 last Tuesday mainly by Mike Macsione and Tommy Olszanowski. Karen Kephart and Pat Richards helped out loading.The chamber was installed, intact with no broken wires.
A final check of the readout wires showed no shorts to ground and 1 short between 2 sensor anode wires. The shorted anode wires do not effect the operation of the chamber (e.g. field strength). But, the signal from the two wires will be mixed.
The cantilevered foot supports fastened to the downstream face of Rosie were 1/2" East of the chamber's feet. The cantilevers had welded seating rings which didn't allow for fit. Otto Alvarez milled the rings off, perfect fit.
The chamber still needs to be filled with preamps and cables. I'll contact the e907 group for assistance as soon as I begin. Pierrick is working on getting cables & labels.
Chamber #3:
DC3 has yet to be opened & re-gasketed, et cetera. The minimal work necessary, without extensive repair necessary, is 80-100 hours. Extra repairs could add 60-80 hours. What priority do I give this repair compared to the DC4 installation?Chamber #1: DC1 will be next on the integrated test stand.
Chamber #2: DC2 needs preamp supports and cable trays.
DC5 & DC6 (Iowa Chambers)
Alignment
The next call will be Tuesday, 27 May 2003, at 1:00 PM CDT in WH-2NE, Snake Pit.