Floor Elevation Survey
RICH Rail Elevation Survey
Component Coordinates
Drawing
Gary Smith maintains the current version of the experiment layout in the MC7 worm, with structural details.
Layout (1/22/03, .pdf)
![]()
Cross Sections (1/22/03, .pdf)
![]()
Concrete Block being moved out of MC7. Mike Mascione et alLooking Upstream into MC7- Almost empty
Steel shielding . To be removed?
Looking Downstream towards the bay door MC7
M-Bottom Shoring Work A great deal of work has been done to engineer the support structure for the magnets Jolly Green Giant and Rosy. The engineering design by Bob Woods, approved by FESS is being implemented currently-19-Sep-01
While the building was gone, after the magnets were assembled: