E907
TPC
Cathode Test May 2003
Date: Mon, 5 May 2003 14:36:55 -0500 (EST)
From: David Eric Miller
To: Rajendran Raja
Cc: David Eric Miller , Peter Barnes ,
Pierrick Hanlet
Subject: Re: HV plot
Hi Raja and Peter!
I can plot the TPC data for you but I don't remember
what format you wanted. I can also put it on the web
page. The data is at the end of this email
for your immediate satisfaction.

About the connectors, wires and o-rings:
If Peter has the gaskets for me then
I can put the connectors into the TPC at any time.
Otherwise I need to get the material and punch
out some gaskets myself.
I have a 2 conductor plus ground to isolated ground
BNC bulkhead connector bushing potted here at Lab 6.
However, to open the TPC, run the wires and repair the
o-rings I will need at least one person to help.
Two people helping would be much better.
Peter, should I use vacuum grease on the gaskets?
-david eric miller
p.s. Here is the TPC data.
May 2nd, 2003
1.5 scfh N2 flow rate @ 5 psig
Power Supply Trip Setting 1.01 mA
Note: High Voltage Toggle Switch Light is inactive.
Note: Water from heavy rain is on the floor in the
clean room. Humidity is probably 100%.
Volts Micro-Amps
-1002 -8.4
-1537 -12.8
-2002 -16.5
-2501 -20.5
-3001 -24.5
-3502 -28.6
-4012 -32.6
-4505 -36.6
-5001 -40.6
-5506 -44.7
-6003 -48.6
-6515 -52.7
-7016 -56.7
-7555 -61.0
-7998 -64.6
-8502 -68.6
-9006 -72.6
-9255 -74.6
-9522 -76.8
-9757 -78.7
-10005 -80.6 <--Raja inspects chamber: "No sparking heard."
-10266 -82.7 <--Raja inspects chamber: "No sparking heard."
-10510 -84.6 <--Spark heard. Power Supply Tripped.
Power Supply Reset.
-128 -1.3
-1000 -8.4 <-- Same current draw as before spark. Wires unbroken.
On Mon, 5 May 2003, Rajendran Raja wrote:
> Hi Dave,
>
> Do you have the HV plot for the TPC yet? if not you can give me the page from the log book and I can plot it.
>
> Also, when do you think you will be able to put in the connectors and repair the gasket for the TPC? I will be away next week so perhaps we can get to it this week?
>
> I realize that you are busy with chamber 4 move, which must have priority.
> best regards
>
> Rajendran Raja
> Fermilab,
> WH13E, Rm 1327
> Tel: 630-840-4092
> Fax: 630-840-6311
>
PDB, 6/4/03