E907 MIPP TPC Reconstruction

First Reco Meeting February 7-8, 2005


Contents

Agenda
Jobs
Reconstruction/Analysis Algorithms

Agenda

TPC Hardware Overview (.html  .pdf [44 MB].ppt [51 MB]  Sorry, too many pictures.)
TPC DAQ and Software (.pdf, .sxi)
Reco Framework (.pdf)
TPC Reco JP (.pdf)

Jobs

PriorityTaskPersonMethod
1 Cluster Finding Jon Paley Pick up diagonally connected hits in clustering, and take into accout dead pads.
Track Finding Allow tracks to share hits. Look not just along z-dir. but towards target/vertex in order to find high p_t tracks.
1 T0 Shift + Drift Velocity Jon Paley (1) Use BC beam fit + TPC Reco tracks that exit top of TPC.
(2) Use TPC Tracks + DC Wire Hits.
1 Gain David Miller
Mike Heffner
Plot ADC/fit_frac for pads in beam, show magnitude of variation along x,z
1 Hit finding David/Jenn/Mike Fit to Gauss in x, Gamma in y, show sample fits
1 Distortion Ron Soltz Implement Rolandi-Blum distortion, plot corrected residuals for beam tracks
2 Vertexing Jon Paley Implement straightline-swim iterator, plot vtx x vs. y
2 dE/dx Jenn Klay Plot unoptimized dE/dx vs. 1/R, then optimize truncation
2 Track Fitting Jon Paley
2 Geometry Peter Barnes
Alignment
3 Particle ID Jenn Klay
3 Secondary Vertices (V0) Jon Paley
Mike Heffner
3 Monte Carlo:
Gain
Distortions

Reconstruction/Analysis Algorithms


Valid XHTML 1.0! PDB, 2/8/05