Moving the TPC from PC4 to IB4
Many thanks to Peter Barnes, Leon Beverly, Steve Johnson,Mike Mascione, Dave Northacker, Gulshan Rai, Ron Soltz, the rigging crew and IB4 managers,Particle Physics and Technical Division leadership, Safety Personnel … for making this happen smoothly.
Pictures courtesy of Peter Barnes
·
·
TPC being
lifted at Proton Center 4
·
·
TPC resting
2” off ground while plate prepared on trolley
·
·
Lab7
Main Bay crane and Ron
·
·
Lab7 Clean
Room
·
·
Tar file
containing more pictures
·
The following 4 notes
were prepared by Peter Barnes.
TPC
in Pictures—More pictures on the TPC.
TPC
Handling—A note on how to handle the TPC wih pictures.
TPC
Cathode Plate Installation – A note on how to install the Cathode plate of
the TPC.
TPC
High Voltage tests- A note showing the measurements made during TPC High
Voltage turn on.
TPC Photos at BNL- These show the TPC as it was cable up for E910 at BNL