Moving the TPC from PC4 to IB4

 

Many thanks to Peter Barnes, Leon Beverly, Steve Johnson,Mike Mascione, Dave Northacker, Gulshan Rai, Ron Soltz, the rigging crew and IB4 managers,Particle Physics and Technical Division leadership, Safety Personnel … for making this happen smoothly.

 

 

 

         Pictures courtesy of Peter Barnes

·        ·        TPC being lifted at Proton Center 4

·        ·        Opening the box at IB4

·        ·        TPC resting 2” off ground while plate prepared on trolley

·        ·        Upstream end of the TPC

·        ·        Lab7 Main Bay crane and Ron

·        ·        Lab7 Clean Room

·        ·        The Chiller Assembly

·        ·        Tar file containing more pictures

·         

The following 4 notes were prepared by Peter Barnes.

 

TPC in Pictures—More pictures on the TPC.

 

TPC Handling—A note on how to handle the TPC wih pictures.

 

TPC Cathode Plate Installation – A note on how to install the Cathode plate of the TPC.

 

TPC High Voltage tests- A note showing the measurements made during TPC High Voltage turn on.

 

TPC Photos at BNL- These show the TPC as it was cable up for E910 at BNL